search query: @supervisor Rinne, Mikael / total: 66
reference: 26 / 66
« previous | next »
Author:Lishchuk, Viktor
Title:Porphyry ore body zonality for the mine planning in context of processing performance
Porphyrymalmin vyöhykkeet louhinta- ja prosessitehokkuuden tekijöinä
Publication type:Master's thesis
Publication year:2014
Pages:80+33      Language:   eng
Department/School:Insinööritieteiden korkeakoulu
Main subject:European Mining Course   (R3008)
Supervisor:Rinne, Mikael
Instructor:Lovén, Pekka
Electronic version URL: http://urn.fi/URN:NBN:fi:aalto-201408292543
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:porphyry ore
geometallurgy
mineral processing
copper
Russia
hydrothermal alteration zonning
porphyry malmi
geometallurgia
rikastus
kupari
Venäjä
hydrotermiset muuttumisvyöhykkeet
Abstract (eng):Mikheevskoye project is a porphyry Cu-Mo open pit mine located in Chelyabinsk region, Russia.
Ore extraction started in 2011 and mineral processing started in late 2013.
Mikheevskoye project is owned by the Russian Copper Company.
This study examines the effect of hydrothermal alteration zonality and geometallurgical ore body zonality on the mine planning and plant feed quality forecast.
The study was conducted at Russian business unit of Outotec, which operates part of the processing plant in Mikheevskoye project.
The empirical part of the study was conducted in October 2013 - January 2014.
Geological data for the study was obtained from Outotec office and Russian Copper Company geologists.
Some geological data was collected through sampling campaign in the Mikheevskoye open pit.
Additional data was gathered through the questionnaire which investigated how processing engineers working on site view the ore body.
A questionnaire was distributed among Outotec and Russian Copper Company process engineers.
The results revealed that mine scheduling based on the geometallurgical zoning is potentially possible and feasible in case of porphyry ore deposits.
In this case, twelve geometallurgical zones were determined theoretically.
Application of hydrothermal alteration zonality helped improve forecast feed grade quality.
Based on the results of this study, it was recommended to conduct additional exploration drilling, evaluate the process performance of the samples retrieved in the drilling and to update the model developed in this study accordingly.
One of the key findings of the study was estimation of the new payback time for the project on the basis of current market situation.
Abstract (fin):Mikheevskoye projekti on Venäjällä, Chelyabinskin alueella sijaitseva porphyry Cu-Mo malmin avolouhos.
Malmilouhinta alueella alkoi vuonna 2011 ja rikastamon toiminta vuoden 2013 lopussa.
Mikheevskoye malmiesiintymä ja rikastuslaitos ovat Russian Copper Companyn (RCC, Venäjän kupariteollisuus) omaisuutta.
Tässä tutkimuksessa tarkastellaan vesiliukenemisesta ja lämpötilagradientista syntyneiden muuttumisvyöhykkeiden sekä mineraalivyöhykkeiden (geometallurgiset) vaikutusta louhintasuunnitelmaan ja ennustettavaan rikastamon syötön laatuun.
Tutkimusta toteutettiin Outotecin Venäjän alueyksikössä; sama Outotecin yksikkö vastaa vaahdotus- ja vedenpoistopiirin operoinnista Mikheevskoye projektissa.
Tutkimuksen kokeellinen osuus toteutettiin lokakuussa 2013 - tammikuussa 2014.
Geologinen tieto tuli Outotecin ja RCC:n geologeilta.
Osa geologisesta tiedosta oli kerätty paikan päällä avolouhoksesta näytteenottokampanjan merkeissä.
Lisätiedot kerättiin kyselyllä, joka tutkii prosessi-insinöörien ymmärrystä malmiesiintymän piirteistä.
Kysely toteutettiin Outotecin ja RCC:n prosessi-insinöörien keskuudessa.
Tutkimuksen tulokset osoittivat, että louhinnan suunnittelu perustuen mineraali- tai geometallurgisiin vyöhykkeisiin on mahdollista käytännössä ja on myös taloudellisesti kannattavaa porhyrymalmiesiintymissä.
Tässä tapauksessa 12 teoreettista mineraalivyöhykettä oli otettu käyttöön.
Vesiliukenemisesta ja lämpötilagradientista syntyneiden muuttumisvyöhykkeiden huomioon ottaminen auttoi tarkentamaan rikastamon syötteen laadun ennustetta.
Tutkimuksen tulosten pohjalta suositellaan tuotantokairausten toteuttamista, niistä kerättyjen näytteiden analysointia prosessikäyttäytymisen osalta sekä tässä tutkimuksessa kehitetyn mallin päivittämistä ko. tulosten pohjalta.
Tämän tutkimuksen yksi keskeisiä tuloksia oli uusi arvio projektin takaisinmaksuajasta nykyisten metallihintojen pohjalta.
ED:2014-08-31
INSSI record number: 49671
+ add basket
« previous | next »
INSSI