Author:Juvonen, Mikko Juhani
Title:Projektiallianssi asuinrakennuksen peruskorjaushankkeen toteutusmuotona
Project alliance as a delivery method for a renovation project of an apartment building
Publication type:Master's thesis
Publication year:2013
Pages:81      Language:   fin
Department/School:Rakennustekniikan laitos
Main subject:Rakentamistalous   (Rak-63)
Supervisor:Saari, Arto
Instructor:Salmikivi, Teppo ; Ihalainen, Jaana
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:project alliance
delivery methods
collaborative delivery methods
projektiallianssi
allianssiurakka
toteutusmuodot
talonrakennus
yhteistoiminta
Abstract (eng): During the 21st century the complexity and the number of participants in construction projects has grown rapidly leading to more uncertainty in the projects.
Lump sum contracting and inflexible project delivery methods have led to fragmentation of the goals between the client and the contractor, causing disputes and problems in quality.
As a delivery method, a project alliance aims to reduce claims and enhance the quality and productivity of the building process.
In a project alliance the owner and one or more service providers (designer(s), constructors(s)) form an alliance, among which all the risks and profits are shared.
The alliance participants are collectively responsible for the delivery of the project, and the outcome of each participant is conditional on the outcome of the whole project.

This master's thesis focuses on the features of the delivery methods commonly used in Finland and compares them with those of project alliance based mainly on literature.
Part of the study is conducted as a case study of a renovation project of an apartment building, and aims both researching the suitability of project alliancing in the given project and pointing out its possibilities and problems.
The case study has been conducted while working as a part of the project team and is based on the researcher's observations, project documentation and interviews of the key personnel of the project.

In the given project the project alliance as a delivery method has produced a design that meet the requirements set to it by the owner and the feasibility and design solutions have been collaboratively developed and ensured.
Mutual trust is a vital prerequisite for an alliance project and is something that must be worked at throughout the project.
In Finland the project alliance is yet to be further developed but even during the first half of the construction phase it has proved to be a delivery method with feasibility and potential and it may help to achieve good results in challenging projects.
Abstract (fin): Rakennushankkeiden kompleksisuus ja osapuolten määrä on 2000-luvun aikana kasvanut huomattavasti lisäten epävarmuutta hankkeissa.
Kiinteistä kustannusperusteista ja jäykistä toteutusmuodoista on seurannut tilaajan ja toteuttajan tavoitteiden eriytymistä, erimielisyyksiä ja laatuongelmia.
Allianssimallilla pyritään väittämään riitoja ja tehostamaan rakentamisen laatua ja tuottavuutta.
Projektiallianssissa tilaaja, päätoteuttaja(t) ja suunnittelija(t) muodostavat allianssin, jonka kesken kaikki hankkeen riskit sekä voitot jaetaan.
Allianssiosapuolet vastaavat yhteisesti koko hankkeesta ja kaikkien osapuolten tulos on sidottu koko hankkeen tulokseen.

Tässä työssä tutkitaan tavanomaisesti Suomessa käytettyjen toteutusmuotojen ominaisuuksia ja selvitetään tätä vasten allianssimallin ominaisuuksia pääosin kirjallisuustutkimuksena.
Osa työstä perustuu kohdetutkimukseen asuinrakennusryhmän peruskorjaushankkeessa ja tämän tavoitteena on tutkia allianssimallin soveltuvuutta keskisuureen asuinrakennuksen peruskorjaushankkeeseen sekä malliin liittyviä mahdollisuuksia ja ongelmia.
Kohdetutkimus on tehty tutkijan osallistuessa projektiryhmän työskentelyyn ja perustuu tutkijan omiin havaintoihin, asiakirjoihin ja dokumentaatioon sekä hankkeen avainhenkilöiden haastatteluihin.

Allianssimallilla on tutkimuksen kohteena olevassa hankkeessa saavutettu tilaajan vaatimukset täyttävä suunnitteluratkaisu, jonka toteutettavuus ja ratkaisut on yhteisesti kehitetty ja varmistettu.
Edellytys allianssihankkeelle on osapuolten välinen luottamus, jonka eteen tulee hankkeen aikana tehdä töitä.
Toteutusmuoto on suomalaisessa rakentamisessa vielä kehitysvaiheessa, mutta jo rakennustöiden aikana on havaittu sen olevan kehitys- ja käyttökelpoinen toteutusmuoto, jolla voidaan saavuttaa hyviä tuloksia haastavissa hankkeissa.