search query: @keyword scrum / total: 83
reference: 16 / 83
« previous | next »
Author:Lunberg, Peter
Title:Discovering management practices of project management body of knowledge (PMBOK) for improvement using scrum
Publication type:Master's thesis
Publication year:2013
Pages:[9] + 68 s. + liitt. 92      Language:   eng
Department/School:Perustieteiden korkeakoulu
Main subject:Ohjelmistoliiketoiminta   (T-128)
Supervisor:Kauppinen, Marjo
Instructor:Rautiainen, Kristian ; Koskenkylä, Juha
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:scrum
PMBOK
management
practices
knowledge areas
project management
process groups
Abstract (eng): This thesis studies the project management processes and practices of Project Management Body of Knowledge (PMBOK, 4th edition) and Scrum.
PMBOK is developed and maintained by the Project Management Institute.
PMBOK is a generic guide to project management, but it is widely used in IT projects as well.

This thesis focuses on exploring how management of IT systems is seen through PMBOK and Scrum.
The similarity and differences of these models are explored through the literature study.
Practices in PMBOK that could be improved using Scrum are studied through both literature study and the results of the web survey.
The results of the literature study reveal that PMBOK and Scrum have great number management practices in common.
However, while PMBOK is a comprehensive guide for project management, which considers all project phases, it was not originally designed to manage IT projects.
Scrum in the other hand lacks the whole project initiation phase and project procurement management, which PMBOK takes for granted.
Finally, the results of the literature study also reveal that the practices in PMBOK are explained in detail, explicitly, while similar practices in Scrum are explained implicitly, meaning that Scrum puts more emphasis on the Team to decide how to achieve the best results.

The results of the web survey show high support for improving most of the management practices under the Executing and Monitoring Process Groups.
In addition, the results also reveal that only a small number of management practices under the Planning Process Group could be improved with Scrum.
Moreover, the results also reveal that the practices under the Initiating and Closing Process should not be mixed with Scrum, i.e. there is no improvement in these practices.

Agile methodologies, like Scrum, are designed to reduce the costs of change rather than reducing the amount of change.
Under a fixed priced contract, this can be achieved by having the customer prioritizing the items in the Product Backlog constantly.
This way only the highest priority items are always implemented and delivered first, thus creating the highest value and ROI for the customer.
Moreover, delivering the product in Sprints and increments also help in reducing the cost of change.
Finally, by allowing the customer to do feature swaps as well, a higher customer satisfaction can be achieved whilst the system also corresponds to customer's actual needs in the long run and stays within the fixed budget and schedule.
Abstract (fin): Tämä opinnäytetyö tutkii Project Management Institute organisaation kehittämää ja ylläpitämää Project Management Body of Knowledge (PMBOK) sekä Scrum projektinhallinnan prosesseja ja käytäntöjä.
PMBOK on yleinen opas projektinhallintaan, mutta sitä käytetään laajalti myös IT projekteissa.

Tämä opinnäytetyö keskittyy tutkimaan, miten tietojärjestelmien projektinhallinta nähdään PMBOK:n ja Scrum:n näkökulmista.
Näiden kahden mallin välistä samankaltaisuutta tutkitaan kirjallisuuskatsauksen avulla.
Kyselylomakkeen tulosten ja kirjallisuuskatsauksen avulla tarjotaan vastaus mitä PMBOK:n projektinhallinnan käytäntöjä voitaisiin Scrum:n avulla kehittää.

Kirjallisuuskatsaus osoittaa, että suuri joukko PMBOK:n projektinhallinnan käytännöistä löytyvät myös Scrum:sta.
Vaikka PMBOK käsittää kaikki projektin vaiheet ja sisältää kattavat työkalut projektinhallintaan, sitä ei ollut alun perin suunniteltu johtamaan IT hankkeita.
Scrum:sta puuttuu toisaalta kokonaan projektin alustamisvaihe (eng.
"Initiation Phase") sekä kokonaan käytännöt projektin hankintojen hallintaan.
Kirjallisuuskatsaus paljastaa myös kuinka täsmällisesti kaikki PMBOK:n käytännöt on selitetty.
Vastaavat käytännöt on Scrumi:ssa selitetty hyvin vapaasti ja löyhästi.
Scrum tarjoaa Tiimille vapaat kädet toteuttaa käytäntöjä, kunhan Tiimi saavuttaa parhaat tulokset.

Kyselytutkimuksen tulokset osoittavat, että suurin osa projektinhallinnan käytännöistä seuraavien vaiheiden (eng.
"phase") alla voitaisiin Scrum projektihallinnan avulla parantaa: Executing ja Monitoring Process Group.
Lisäksi tulokset paljastavat, että vain pieni osa projektinhallinnan käytännöistä Project Planning Process Group alta voitaisiin parantaa Scrum:n avulla.
Tulokset paljastavat myös, että Initiating ja Closing Process ryhmien alla olevia käytäntöjä ei voi Scrum projektinhallinnan avulla parantaa.

Ketterät menetelmät, kuten Scrum, on suunniteltu vähentämään muutoksen kustannuksia muutosten määrän vähentämisen sijaan.
Kiinteähintaisessa projektissa kustannussäästöjä voidaan saavuttaa niin, että asiakas suorittaa tuotteen kehitysjonon (eng."Produet Backlog") priorisoinnin.
Näin vain korkeimman prioriteetin kohteet (eng.
"Item") toteutetaan ja toimitetaan aina ensin.
Tämä tuottaa asiakkaalle suurinta arvoa ja ROI:ta (eng.
"Return On Investment").
Asiakastyytyväisyyttä ja ROI:ta voidaan myös parantaa antamalla asiakkaan vaihtaa tuotteen kehitysjonon ominaisuuksia (eng.
"Feature swap").
Tämän käytännön avulla toimitettava tuote vastaa pidemmällä tähtäimellä asiakkaan realistisia tarpeita.
Muutoksen kustannuksia voidaan alentaa toimittamalla tuote iteratiivisesti ja inkrementaalisesti.
ED:2013-09-27
INSSI record number: 47266
+ add basket
« previous | next »
INSSI