search query: @keyword CMM / total: 9
reference: 6 / 9
Author: | Viman, Janek |
Title: | Improving the lead time of product development by intensifying measurement process |
Tuotekehitysprosessin läpäisyajan lyhentäminen mittausprosessia tehostamalla | |
Publication type: | Master's thesis |
Publication year: | 2001 |
Pages: | 87 Language: eng |
Department/School: | Konetekniikan osasto |
Main subject: | Koneensuunnitteluoppi (Kon-41) |
Supervisor: | Kuosmanen, Petri |
Instructor: | Laitinen, Mikko |
OEVS: | Electronic archive copy is available via Aalto Thesis Database.
Instructions Reading digital theses in the closed network of the Aalto University Harald Herlin Learning CentreIn the closed network of Learning Centre you can read digital and digitized theses not available in the open network. The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/ You can read theses on the Learning Centre customer computers, which are available on all floors.
Logging on to the customer computers
Opening a thesis
Reading the thesis
Printing the thesis
|
Location: | P1 Ark Aalto 6169 | Archive |
Keywords: | geometric tolerances tolerance analysis inspection measurement CMM geometriset toleranssit toleranssianalyysi tarkistusmittaus koordinaattimittakone |
ED: | 2001-07-03 |
INSSI record number: 17676
+ add basket
INSSI